Over the course of several weeks, FLMSP's tool cache at Foster got an Extreme Makeover!
Before: Leaky, moldy walls
First step was to take everything out:
Next, two coats--6 gallons--of masonry paint:
The old falling-apart shelving unit was replaced with a stainless steel five-rack unit, old railroad electrical cables were cut off at ground level (trip hazard), rocks were removed from the old gravel, and pea gravel was added to make a nicer walking surface.
Here's Carl rewiring the solar panel light fixture:
After: The results of all that work
November 2021