Over the course of several weeks, FLMSP's tool cache at Foster got an Extreme Makeover!

Before: Leaky, moldy walls
2021.10 FosterCacheMakeover moldy walls before 600

First step was to take everything out:
2021.10 FosterCacheMakeover everything out 600

Next, two coats--6 gallons--of masonry paint:
2021.10 FosterCacheMakeover painting 600

The old falling-apart shelving unit was replaced with a stainless steel five-rack unit, old railroad electrical cables were cut off at ground level (trip hazard), rocks were removed from the old gravel, and pea gravel was added to make a nicer walking surface.

Here's Carl rewiring the solar panel light fixture:
2021.10 FosterCacheMakeover rewiring solar light 600

After: The results of all that work
2021.10 FosterCacheMakeover after 600
2021.10 FosterCacheMakeover after2 600
2021.10 FosterCacheMakeover after3 600